Athens Attiko Metro
ExtensionLine 2: Ag. Dimitrios – Elliniko: TBM Works at Argyroupoli Shaft
Extension Line 3: DoukissisPlakentiasCross-boardingMETROStation
Extension Line 3 Monastiraki – Haidari
Extension Line 3 Monastiraki – Haidari
Extension Line 2 Sepolia - Peristeri
Extensions Lines 2 & 3 E/M Installation, Testing & Commissioning Works
ATTIKO METRO LIST OF MOST IMPORTANT PROJECTS WHERE
OMEK WAS INVOLVED AS A TECHNICAL CONSULTANT
Nr |
Project Title |
Project Characteristics |
1 |
Extension Line 3: Ethniki Amyna – Douk. Plakentias |
Metro Line Length 4.4 km with TBM method
|
2 |
Extension Line 3: Monastiraki - Egaleo |
Metro Line Length 4.3 km with NATM method
|
3 |
Extension Line 3: Egaleo - Haidari |
Metro Line Length 1.5 km with NATM method
|
4 |
Extension Line 2: Dafni – Ag Dimitrios |
Metro Line Length 1.2 km with NATM method
|
5 |
Extension Line 2: Ag Dimitrios - Elliniko |
Metro Line Length 5.5 km with TBM method
|
6 |
Extension Line 2: Sepolia – Ag. Antonios |
Metro Line Length 1.4 km with TBM method
|
7 |
Extension Line 2: Ag. Antonios - Anthoupoli |
Metro Line Length 1.8 km with NATM method
|
8 |
Extensions Lines 2&3: Design, Installation, Testing & Commissioning of E/M Equipment |
Extensions Lines 2&3: Cost €165 million
|
9 |
Extensions Lines 2&3: Design, Installation, Testing & Commissioning of Power Supply, Traction Power, and Communication Systems |
Extensions Lines 2&3: Cost €72 million
|
10 |
Extensions Lines 2&3: Design, Installation, Testing & Commissioning of the Automatic Train Supervision Systems |
Extensions Lines 2&3: Cost €18 million
|