Egnatia Odos Motorway

MesovouniTunnel total length 1.010m Grika Tunnel total length 1.323m Krystalopigi Bridge length 850m (RB) (Ch. 23+615 – Χ.Θ. 24+465) and 637m (LB) (Ch. 23+622 – Χ.Θ. 24+259)
Dodoni Tunnel Length of the two bores 6400 m Tunnel S3 Length of the two bores 560 m Egnatia Odos Motorway at Ch 9+600 to 10+000

 

 

Valley Bridge G7 length 164,00 m RB and 161,00m LB TunnelS1Nlength 823m RB and 845m LB. Bridge Γ7164 m length Right Carriage way and 131 m Left Carriage Way
Cut & CoverΣlength 393m RB and 265m LB.
Major Landslide Stabilization Works
MegaloremaRiver Bridge length 518,90 m RB and 487,80m LB Metsovo I/J Ag. Nikolaos Tunnel and Reinforced Rock Embankment of 75 m high

 

 


Driskos Tunnellength 4563m RB and 4581m LB.
The Bigger Tunnel of Egnatia Odos Motorway and one of the major Tunnels in Greece
Section 1.1.6
Krystallopigi - Psilorachi
Votonosi Cantilever Valley Bridge length 477 m RB and 490 m LB
Midpiers Span 230m

 

LIST OF ΟΜΕCONSTRUCTION MANAGEMENT MAJOR CONTRACTS in EGNATIA ODOS WESTERN SECTION MOTORWAY

Serial No Contract No SECTION

CONTRACT TITLE

PROJECT CHARACTERISTICS

1 901 1.1.2 Ladochori - Lykopodi Motorway Length 6.976,00 m

  • Igoumenitsa I/J
  • Embankments
  • 3 Under Passes
  • Hydraulic Works
2 902 1.1.3 Lykopodi - Makrichora Motorway Length 4.775 m.

  • Vasilikos I/J
  • Vasilikos Tunnel 590 m RB and 454 m LB.
  • Cut & Cover Σ1 160 m RB and 265 m LB.
  • 2 Under Passes
  • Embankments of 650 m length
  • Reinforced Embankment Γ2 of length 424 m and height 30 m
  • Cut Excavations 1.720 m
  • Hydraulic Works
3 991               (904) 1.1.4 Mesovouni and Grika Tunnels Motorway Length 2.055 m.

  • Mesovouni Tunnel 496 m RB and 509 m LB
  • Grika Tunnel 642,2 m RB and 679 m LB
  • Embankment between the two Tunnels length 470 m and height 25 m.
  • 2 Under Passes
  • Hydraulic Works
4 905 1.1.5 Makrichora - Krystalopigi Motorway Length 10.395 m.

  • Neochori I/J
  • Neochori Tunnel single bore 593 m length
  • 7 Under Passes
  • Cuts and Embankment Construction
  • Hydraulic Works
5 906 1.1.6 Krystalopigi - Psilorachi Motorway Length 10.245 m.

  • Krystalopigi Tunnel 193 m RB and 194 m LB
  • Tunnel Σ1 513 m RB and 520 m LB
  • Tunnel Σ2 965 m RB and 1189 m LB
  • Valley Bridge Γ4 length 220 m per carriage way
  • Valley Bridge Γ7 164 m length Right Carriage way and 131 m Left Carriage Way
  • 3 Under Passes and 1 Overpass
  • Embankments and Cuts
  • Hydraulic Works
6 993             (962) 1.1.7/8 Mesovouni and Krystalopigi Bridges
  • Mesovouni Bridge of 258 m per Carriage Way
  • Kristalopigi Valley Bridge 849 m Right Carriage Way and 637 m Left Carriage way.
7 908 1.2.1 Psilorachi – Ag. Nikolaos Motorway Length 7.547 m.

  • Open Cover of 144 m length.
  • 6 River Bridges of total length 224 m.
  • 1 Under Pass and 1 Over Pass
  • Embankments and Cuts
  • Hydraulic Works
8 909 1.2.2 Ag. Nikolaos - Koumaria Motorway Length 7.532 m.

  • Selloi I/J
  • Tunnel Σ1Ν 823 m RB and 845 m LB
  • 3 River Bridges of total length 201 m
  • 3 Under Passes
  • Cuts Excavations
  • Hydraulic Works
9 910 1.2.3 Koumaria – Ag. Anastasia MotorwayLength 4.905 m.

  • Tunnel Σ2 827 m RB and 857 m LB
  • Tunnel Σ3 285 m RB and 276 m LB
  • Embankments Construction
  • Hydraulic Works
10 911 1.3.1/1.3.3/2.1/2.2 Ag. Anastasia – Dodoni Tunnel Entrance & Dodoni Tunnel Exit – Pedini - Drosochori MotorwayLength8.12m.

  • Dodoni I/J
  • 3 Under Passes and 1 Over Pass
  • Embankments and Cuts Construction
  • Reinforced Embankment 1179 m length
  • Hydraulic Works
11 912 1.3.2 Dodoni Tunnel DodoniTunnelof Length 3.347 m. at Right Bore and 3.347 m at Left Bore.
12 1005 1.3.3/2.1 Completion works of section Dodoni Tunnel Exit Portal -  Ioannina IC MotorwayLength12.770 μ. (υπό κατασκευή)
Περιλαμβάνει:

  • Ioannina I/J
  • Reinforced Earth Wall of 658 m length
  • 6 River Bridges of 171 m length
  • 13 Under passes and 2 Over Passes
  • Embankments and Cuts Construction
  • Hydraulic Works
13 958 23 Driskos Tunnel DriskosTunnelof Length 4.563 . Right Bore and 4.581 m Left Bore.
14 915 2.4 Section Arachthos - Peristeri MotorwayLength 8.732 mμ

  • Zagori I/J
  • 6 River Bridges of 171 m length
  • Prestressed Bridge Τ5 of 247 m length per Carriage Way
  • Tunnel T6 314 m RB and 295 m LB
  • Tunnel T8 2596 m RB and 2622 m LB
  • Cuts Excavations of total length 980 m
  • Embankments Constr. of total length 1400 m
  • 1 Under Pass (three span bridge)
  • Hydraulic Works
15 916 3.1 Section Peristeri to Anthochori Tunnel Motorway Length4.142 m.

  • Peristeri I/J
  • Cut & Cover Σ1 393 m RB and 265 m LB
  • Cut & Cover Σ2 143 m each Bore
  • Metsovitikos river Bridge of 150 m length
  • Reinforced Embankments 3.500 m length
  • Cuts Excavations
  • 1 Under Pass
  • Hydraulic Works
16 917 3.2 Section Anthochori Tunnel to Metsovo I/J. Motorway Length6.632 m.
Περιλαμβάνει:

  • Anthochori Tunnel 716 m RB and 705 m LB
  • Votonosi Tunnel 514 m RB and 527 m LB
  • Dio Koryfes Tunnel 756 m RB and 745 m LB
  • Krimnos Tunnel 1.103 m RB and 1.095 m LB
  • Kalamies Tunnel 766 m RB and 845 m LB
  • Votonosi Bridge 477 m Right Carriage Way and 490 m Left Carriage Way
  • Megalorema River Bridge 518 m Right Carriage Way and 487m Left Carriage Way
  • Rock Reinforced Embankment of Metsovo I/J 65 m high
  • Embankments Reinforced and not
  • Hydraulic Works
17 959 3.3 Metsovo I/J, Anilio and Ag. Nikolaos Tunnels Motorway Length6.632 m.

  • Ag. Nikolaos Tunnel 362 m RB and 388 m LB
  • Anilio Tunnel 2.202 m RB and 2.152 LB
  • Connecting Road of Metsovo I/J to existing national Road, of total length 2.700 m, constructed with 9 Reinforced Embankments and 9 Cuts
  • Tunnel at Connecting Road of petal shape 400 m length
  • Hydraulic Works

ΟΜΕhas also played the role of Construction Manager for another 22 Contracts which included Completion and E/M Works of above Sections, as well as Provincial Road Network Rehabilitation.